How Are Bridges Built Over Water?

Short answerMost bridges over water are built in pieces on land or on barges, then lowered, slid, or floated into position. The hard part is the foundation: workers drive piles or sink huge watertight boxes called caissons to the riverbed, then build piers up from there and set the span on top.

The short answer is that almost nobody builds a bridge while standing over open water. The work happens on dry land, on temporary platforms, or on barges, and the water gets crossed in manageable pieces.

How do they build the foundations in the water?

Foundations come first, because everything rests on them. Crews either drive long piles into the riverbed or sink a caisson, a big watertight chamber that gets pushed down to the bottom. Workers pump out the water and pour concrete inside. Some caissons are pressurized with air so people can work in them without water rushing in, which is the same idea behind the bends that divers get.

How are the bridge piers and spans put in place?

Once the foundation is solid, a pier rises out of the water. For the span itself, there are a few common routes:

What is a temporary bridge over water?

Sometimes the first bridge is disposable. A temporary trestle or work platform goes up so people and machines can reach the middle, and once the real bridge is finished, the temporary structure comes back out. It is scaffolding for a river.

What is the strangest way a bridge gets built over water?

Some spans are built on land and then floated into place as one piece. The railway bridge at Rendsburg in Germany is one famous example, and floating bridges in Norway and Washington State do it at a much larger scale. The bridge is essentially a boat until it is anchored.

How long does it take to build a bridge over water?

It depends on the width, depth, and weather. Small spans can take months, while major water crossings run into years. The table below shows the rough order of work.

StageWhat happens
SurveyMap the riverbed and currents
FoundationPiles or caissons go in
PiersColumns rise above the water
SpanDeck is set, launched, or floated
FinishRemove falsework, pave, test

The next time you cross one, look down at the piers. That is where most of the quiet, wet, difficult work happened.